A Data Center the Community
Can Say Yes To.

Self-powered. Quiet and clean. A good neighbor.

Everything below is what this project asks of Spanish Fork, and what it gives back.

A Data Center
the Community

Can Say Yes To.

Self-powered. Quiet and clean. A good neighbor.

Everything below is what this project asks of Spanish Fork,

and what it gives back.

A Data Center the Community
Can Say Yes To.

Self-powered. Quiet and clean. A good neighbor.

Everything below is what this project asks of Spanish Fork, and what it gives back.

We bring and pay for our own power

Zero draw on the municipal grid.

We keep the air clean

Near-zero local air emissions.

We use water carefully

A fraction of typical use.

Same building, better use

Adaptive reuse, no new structure.

A good neighbor

Meaningful community contribition.

A computing facility that asks nothing of Spanish Fork’s power grid, a fraction of the typical water use, adds no new building to the skyline, and runs on the cleanest large-scale power technology available.

A computing facility that asks nothing of Spanish Fork’s power grid, a fraction of the typical water use, adds no new building to the skyline, and runs on the cleanest large-scale power technology available.

We Bring Our Own Power, So We Don't Take Yours.

100%

Off-grid fuel cell generation

No interconnection to Spanish Fork Power. Not even as backup. No transmission upgrades, no substation, no rate impact, no capacity taken from city growth.

Zero

Diesel generators on site

Modular blocks are individually serviceable while the rest carry load.

Confirmed

Enbridge gas capacity

A new dedicated lateral means zero impact on existing residential or commercial gas customers.

No Combustion. No Flame.

No Combustion. No Flame.

Fuel Cells convert chemical energy directly into electricity through an electrochemical reaction between hydrogen and oxygen. No moving parts, no combustion. Fuel cells generate power electrochemically, not by burning fuel.
There’s no open flame and no combustion emissions. Just clean, reliable electricity suited for large-scale, grid-independent generation.

Multiple gigawatts of ultra-low emission capacity already deployed worldwide across data centers, manufacturing, and critical infrastructure

The Emissions That Matter Locally, Addressed.

Utah County sits in the Southern Wasatch Front ozone non-attainment area, where nitrogen oxides (NOx) are the pollutant regulators watch most closely.

This Facility

5.17 tons/yr

Entire permitted annual NOx total. About 2,050 cars.

Spanish Fork Traffic

106 tons/yr

From roughly 42,000 city vehicles alone.

Utah County Traffic

1,640 tons/yr

From roughly 650,000 vehicles countywide.

Permit Status

Intent to Approve

Minor Source air permit under public review by the Utah Department of Environmental Quality through September 5. Formal approval expected mid-September.

All figures in tons per year. Facility NOxper air-quality permit application. Traffic NOx from Utah DAQ/EPA MOVES mobile-source inventory estimates.

Power Source

NOX

VOC

SO2

PM 2.5 / PM 10

CO

Volition, Spanish Fork

5.17

22.39

17.22

0.12

0.005

Lake Side (Vineyard Gas plant, actual permit)

~97

~384

~51

~67

~19

Natural gas turbine (controlled)

~167

~25

~4

~111

~57

Natural gas reciprocating engine (controlled)

~5,970

~464

~173

~146

~9

Diesel Generator

10,200-29,500

~12,700

~1,630

~1,620

~28

Utah grid average

~2,600

~780

All figures in tons per year. CO, VOC, and PM2.5/PM10 aren't shown for the Utah grid average because EPA doesn't publish them in a comparable, current, state-level format.

We Use Water Carefully.

Cooling

Closed loop

No evaporative towers, no plume.

Initial fill

500,000 gal

Two Utah households for one year.

Annual usage

250,000 gal

One Utah County household

Commitment

Within permit

Under the permitted allocation.

"We are not requesting any additional water rights."

If we used evaporative towers

650M + gal/yr

= 3,400 Utah County households

What we actually use

250k gal/yr

One Utah household

Based on Utah County's 2024 per-capita consumptive water use (155 gal/pearsoon/dau/ Central Utah Water Concervancy District, filed with the Utah Division of Water Rights, June 2025) x 3.39 persons/household (U.S. Census Bureau, Utah County, 2020-20224 ACS 5-yrest.)

Same Building, New Purpose.

Where we are building

This land already reads as energy and logistics infrastructure.

Sits at the canyon mouth, beside the existing wind turbines

Adjacent to the active rail line

Fronts the highway corridor

Existing industrial building, No greenfield construction

<65 dBA

Noise at 10 ft per unit. Conversation level. Property-line acoustic study underway.

No change

To the skyline. Interior fit-out of an existing building only.

Dark-sky

Compliant exterior lightning throughout the site.

~$4B

Total project investment covering retrofit, fuel cells, electrical, fire, security, and engineering.

From 6,900 Trucks a Month to a Few Dozen Cars a Day

FULLY ACTIVE DISTRIBUTION USE

85 loading bays

~6,900 trucks/month. 69,000 truck-miles/month at a 10-mile round trip to the freeway corridor


Monthly tailpipe emissions from that traffic alone: ~116 metric tons CO2, ~103 kg NOX, ~ 2.1kg PM2.5

=1,400 metric tons CO2 • =1,230 kg NOx • =25kg PM2.5 per year, at this baseline volume*

FULL DATA CENTER OPERATIONS

~100-200 employee vehicle trips/day.

No recurring heavy-truck traffic

No loading-dock operations; the yard holds fuel cells, not freight

The baseline traffic emissions: effectively eliminated,

not added to

*Estimates for full occupancy by a distribution tenant, based on ITE Trip Generation and SCAQMD warehouse truck-trip rates applied to the building's total sq ft, at a 10-mile round trip to the freeway corridor.

"The truck traffic this site generates today is the baseline. This project doesn't add to it. It removes it."

A Major Taxpayer, And a Present Neighbor.

~$40M

Per year in combined property taxes.

One of the largest tax bills in the county,

with the largest share flowing to Nebo School District.

400-600

Peak construction workers during the retrofit.

100-200

Permanent full-time roles in operations, security, controls, and Bloom maintenance.

Direct Contribution & Covenant

More than $500,000 in direct contribitions.

Professional industry training and education

Nebo School District CTE pathways and UVU engineering internships

Paid apprenticenships

Local presence: sponsorships, local hiring preference, and a standing

community liaison

Property tax based on estimated project value at a combined Utah County / Spanish Fork / Nebo SD rate of ~0.9-1.0%, declining as personal property depreciates. Pending confirmation with the Utah County Assessor.

We'll Put This in the Development Agreement

Council has heard confident promises from data center developers before. Our answer is to volunteer enforceability, in writing, in the agreement itself.

Water use cap

No-grid-interconnection covenant

Decommissioning plan: modular skids, removable by truck

Enforceable noise limit at the property line

No-diesel covenant

Annual public reporting on all of the above

Let's build data centers communities can say yes to.